- Study on existing LTMS power system operators in coordinating and communicating to ensure the successful multilateral energy trading through Communication Mechanisms and Platform by System Operator at EGAT as wheelers of electricity in LTMS Project.
- Experiences and best practices from the SAPP and the ENTSO-E, particularly in handling the operation of a rather more advanced power trading model.
- Panel discussion of the existing LTMS coordination and communication mechanism in case of critical period occurs during the power transfer in the four countries involved.
Guidelines
Powering Regional Grid Interoperability: The Crucial Role of Transmission System Operators in the LTMS-PIP
Executive Summary
Electricity market, communication mechanism and congestion management are of utmost importance among inter-TSO coordination task. To address these issues, APSO Secretariat has provided the CoP for multilateral energy trading (MPT) in the LTMS-PIP to advance the overall efficiency reliability of the energy trading process in the ASEAN Power Grid (APG) under the ASEAN Plan of Action for Energy Cooperation (APAEC) Phase II: 2021-2025.
This study focused on improving the coordination and communication mechanism for Transmission System Operators (TSOs) of LTMS-PIP also a more advanced trading models in grid system among power system operators. The aim was to facilitate MPT within the LTMS- PIP. The key discussion outlined as below: