The L53-DD8 (water disposal) well was drilled from the DD oilfield wellpad to a total measured depth of 1,353 meters at a subsurface location 490 meters southwest.  This well was drilled at a location which was furthest down dip from the crest of the structure with the intention of using it as a water disposal well; however, wireline logs, pressure data and oil shows while drilling indicated approximately 6.9 meters of high quality net oil pay in the AA sand, 4.64 meters of high quality oil pay in the BB sand and 7.73 meters of high quality oil pay in the CC sand.

User Dashboard

Back To ACE